单选
If you see discoloration, replace the part.
单选
If you find a crack, do the applicable repair procedure.
单选
Remove the tag.
单选
The load is applied axially.
单选
Disconnect the cable from the rear side of the instrument.
单选
These parts can easily bend, break or become incorrectly aligned.
单选
The navigation lights change from dim to bright.
单选
In this configuration, the hydraulic pressure bypasses the valve.
单选
Move the lever rearward.
单选
If the radio signal is not clear, adjust the frequency.
单选
Corrosion can have many causes.
单选
The user of the schematic diagram is the pilot.
单选
Deactivation/Reactivation procedures for circuits, systems, units, etc., shall be included.
单选
Documents must be readily revisable.
单选
Install the manifold.
单选
The control unit is installed aft of the cockpit.
单选
Examine the seal for defects.
单选
Hold the cylinder tightly.
单选
Make sure that the latch is fully engaged.
单选
Install the valve and the correct gasket.
单选
Database synchronization is in progress.
单选
Do not loosen the nut to align it.
单选
Bleed the system before you disconnect the components.
单选
Remove the sealant with a blunt scraper.
单选
The computer controls compressor airflows to prevent stall.
单选
You can stop the starting sequence at any time.
单选
Remove and discard the cotter pins and the nuts.
单选
Do an inspection of the adjacent area.
单选
This figure shows the structure of the system.
单选
We recommended that you do not do this procedure in the hangar.
单选
Use the manual control in an emergency.
单选
Make a careful estimate of the damaged area.
单选
The precision of this adjustment is important.
单选
If the values are different, do this test.
单选
Remove the valve located adjacent to pump.
单选
Loosen the nut one full turn.
单选
This shows that you can install an alternative relay.
单选
Do not disassemble or repair igniter plugs.
单选
The flow of fluid through the valve must be continuous.
单选
You can gain access to the machinery by removing the cover.
单选
Attach the panel to the structure with the bolts.
单选
If the circuit breaker opens, de-energize the circuit.
单选
Do not exceed this speed with landing gear extended.
单选
All personnel must fully know the safety precautions.
单选
Polish the window pane with a soft cloth.
单选
To remove the cover assembly (9), first remove the four screws (10).
单选
Make sure that there are no leaks.
单选
Cracks can have a maximum length of five inches.
单选
Set the rotary switch to INPUT.
单选
CAUTION: WHEN YOU REMOVE THE PROBES, DO NOT LET THEM TOUCH EACH OTHER.
单选
Connect the disconnected wires.
单选
Install the seat before you install the cushion.
单选
The dimensions are given in the table.
单选
Make sure that the landing-light cutoff-switch power connection is safe.
单选
Examine the removed parts for damage.
单选
The color of the indicator changes to green.
单选
One generator can supply power for all the systems.
单选
Adhere to the safety instructions.
单选
Lift the cylinder above its installed position.
单选
Fuel goes through the atomizers into the combustion chamber.
单选
Attach the cable to the structure with wire.
单选
Prevent movement of the components when you repair the unit.
单选
Write noun clusters of no more than three words.
单选
Use the specified tool to seal the opening.
单选
Vertical lists make long complex sentences much easier to understand.
单选
It is mandatory to do this procedure in this service bulletin.
单选
Remove the four screws that attach the flange to the cover.
单选
If the probes touch each other, they can become demagnetized.
单选
Future reference to the unit may be by abbreviation.
单选
Those instructions are necessary to carry out the scheduled servicing.
单选
Vertical pages rather than horizontal are preferred for all types of publication.
单选
This specification will meet the applicable government regulatory requirements.
单选
Torque the bolts to the force between 0.56 and 0.60 m.daN.
单选
Turn the clamps to free the pipes.
单选
Supply hydraulic power to system B with the pump.
单选
Operate the elevator in the full travel 6 times.
单选
Make sure that all the galley compartments are empty.
单选
More than one person is necessary for this procedure.
单选
Put the aircraft back to its initial configuration.
单选
Be careful when you use consumable materials.
单选
Clean the area from unwanted sealant.
单选
Do not point the compressed air outlet at your skin.
单选
Use gloves when you touch parts with edge serrations.
单选
The indicator shows the level of hydraulic fluid in the reservoir.
单选
Turn the knob to make the display go out of view.
单选
Do an inspection of the damage and of the adjacent area.
单选
Drain approximately 2 liters of fuel from the tank.
单选
Do not do this procedure in the hangar.
单选
Calculate the pressure with the applicable formula.
单选
Make sure that there is no dust on the surface.
单选
Identify the wires with sleeves of different colors.
单选
Move the rod in the opposite direction.
单选
Make sure that the tension in the cables is correct.
单选
This procedure is applicable only in digital mode.
单选
Explain how to avoid and notice fuel contamination.
单选
Maintenance information needs to be continuously updated.
单选
Other information may be displayed on the cover.
单选
Access and location instructions are provided here unless obvious.
单选
Operate the unit for two cycles to remove air from the lines.
单选
Move the tensiometer along the cable.